Saturday, February 07, 2015

A Day Late, A Donut Short.

I finished my leg warmers (aka as the renamed "boot toppers") on a day we hit 42F degrees. After a week where we had two days of -10F temps with the windchill.

Go figure.

But I'm ready for the next blast, should we get one this late in the winter. And with it being the Midwest, it's not out of the realm of possibility.

 photo IMG_5718_zpsfd90830c.jpg

 photo IMG_5716_zpsaaf999fe.jpg


I adore these cables.

 photo IMG_5713_zps8a0d1594.jpg


And if the snow is too high, reverse the cuff and bring the warmer up past the knee.

 photo IMG_5720_zps37bbbd41.jpg








* * *

US 13 - 9.0 mm (for the cable piece)
US 11 - 8.0 mm (for the leg shaft)

Yarn
Plymouth Yarn De Aire

How much?
4 skeins = 436.0 yards (398.7 meters), 400 grams

Colorway
Manhattan

Purchased at
Jimmy Beans Wool in Reno, Nevada



Notes
The cabled band is sewn together with mattress stitch for a sturdier seam.

Stitches picked up around the edge - 70 total, adjust to 68 stitches.

Shaft of the leg is 2x2 ribbing, size 11US dpns. Knit to 6” in length.

Cable pattern used:
Cast on 28 stitches

Borders
Odd rows: K2, P2
Even rows: P2, K2

Knit Stitch – K
Purl-P
Reverse Stockinette Stitch-St st

Cable 8 Back (C8B)- slip next 4 sts onto cable needle and hold at back of work, knit next 4 sts from left hand needle, then knit sts from cable needle.

Cable 8 Front (C8F)- slip next 4 sts onto cable needle and hold at front of work, knit next 4 sts from left hand needle, then knit sts from cable needle

Skill: Intermediate
Cast On: Panel of 20 sts on a background of reverse St st.

Row 1
(Right side): k20.

Row 2
P20.

Row 3
k4, C8F twice.

Row 4
P20.

Row 5
k20.

Row 6
p20.

Row 7
k20.

Row 8
P20.

Row 9
C8B twice, k4.

Row 10
P20.

Row 11
k20.

Row 12
P20.

Repeat rows 1-12 until you have reached your desired length.